Customization: | Available |
---|---|
After-sales Service: | Online and Offline Services |
Warranty: | 12 Months After Running in Customer′s Factory |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Our filling machine is a three-in-one filling machine, which includes three parts: washing, filling and capping. When glass bottles are transported from the unscrambler to the filling machine, they are first rinsed inside and out, and then sent to the filling section. Depending on the liquid, the shape of the storage tank will vary. After filling, enter the capping/capping part, and finally enter the next step through the conveyor belt.
Model | BGF14-12-4 | BGF16-16-5 | BGF18-18-6 | BGF24-24-8 | BGF32-32-10 | BGF40-40-12 |
Number of rinsing head | 14 | 16 | 18 | 24 | 32 | 40 |
Number of filling head | 12 | 16 | 18 | 24 | 32 | 40 |
Number of capping head | 4 | 5 | 6 | 8 | 10 | 12 |
Rated production capacity(500ml) | 2000bph | 3000bph | 4000bph | 6000bph | 10000bph | 15000bph |
Installed capacity(KW) | 3.2 | 3.6 | 4 | 4.8 | 7.6 | 8.3 |
Overall size(LxWxH,mm) | 2100*1800*2400 | 2200*1900*2400 | 2450*1900*2400 | 2750*2250*2400 | 4000*2300*2400 | 4550*2650*2400 |
Feature of Water Filling Machine:
1 Direct connection technology between air conveyor and in-feeding starwheel is applied to replace in-feeding screw and conveying chain to ease bottle changing process with only to change few parts. Newly-designed bottle-separating grippers are assembled to starwheel.
2 We adopts Neck-hanging technology in bottle transportation. Instead of traditional starwheel, we use neck-hanging gripper to make bottle-size-changing easily , without equipment height adjustment ,only few parts need to be adjusted
3 Specially-designed rinser grippers which are made of stainless steel are firm and endurable, with no contact to screw part of the bottle to prevent second pollution.
4 High-speed, easily-cleaned filling valves with big flow volume are equipped with well CIP system and control system to rinse the equipment thoroughly.
5 splint of starwheel using twist descending way to simplify the process of bottle-size-changing. Only need to change arch board and starwheel, within ten minutes.
1)Water treatment system
Source water tank →Source water pump→ Quartz sand filter→ Active carbon filter→ Ion soften machine→ Fine filter →Reverse Osmosis → Ozone sterilizer → pure water tank
(Description: The processing flow adopted by a set of Pure Drinking Water Treatment System depends on quality of water source and target purpose of water usage. The selected flow basically includes three parts: pretreatment system, micro processing system and terminal processing system. The Pretreatment system includes multi-media filter, active carbon filter, softener, iron-manganese removal filter, ultra-filter, micro-filter, etc. The micro processing system adopts membrane filtration and ion exchange method. The terminal processing system involves in ozone/UV sterilization, iron exchange etc.)
2) Bottle filling & packing system
Pure water tank→Bottle blower→Air conveyor →Washing, filling & capping 3-in-1→ Light check → Full-automatic labeling machine → Ink jet machine →Full automatic PE film packing machine→ warehouse
(Description: Spring cramps are used in the bottle washing process. The empty bottles can be turned over 180~ along the conveying rail. There is once time of internal and external washing, the efficiency of bottle washing is high.
Q1: which city are you in? how can I get to your factory? Are you a trading company or factory?
A1: We are in Zhangjiagang city, two hours driving from Shanghai. We are factory. Manufacturing mainly beverage filling and packagingmachines. We offer turnkey solutions with more than 10 years experience.
Q2: Why is your prices higher than others?
A2: We offer high-end machines in our business. Welcome to our factory to have a visit. And you will see the difference.
Q3: What is your delivery time?
A3: Normally 30-60 working days depends one machines, water machines are faster, carbonated drink machines are slower.
Q4: How to install my machines when it arrives? How much the cost?
A4: We will send our engineers to your factory to install the machines and train your staff how to operate the machines If needed. Or you can arrange engineers to study in our factory.
You are responsible for air tickets, accommodation and our engineer wage USD100/day/person.
Q5: How long time for installation?
A5: Subject to machines and the situation in your factory. If everything is ready, it will take about 10 days to 25 days.
Q6: How about the spare parts?
A6: We will send one year enough easy broken spare parts together with the machines for free, we suggest you buy more units to save international courier such as DHL, it is really costly.