Customization: | Available |
---|---|
Type: | Injection Bottle Blowing Machine |
Automatic Grade: | Automatic |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Model K6 | ||
Bottle type specification |
Cavity | 6 |
Max.volume | 2L | |
Bottle mouth maximum overall diameter | 28-30mm | |
Bottle biggest diameter | 100mm | |
Bottle maximum height | 330mm | |
Capacity specification |
Theory output | 9000~12000BPH |
Bottle type volume | 500ML | |
Bottle type weight | 17g | |
Bottle type | Round | |
Power specification | Light tube quantity | 32pcs |
Light tube power | 1.25KW | |
Maximum heating power | 40KW | |
All electric machine installation | 49KW | |
Actual consumption | 30%--60% | |
Air pressure specification |
Work pressure | 5-6kg/cm2 |
Blow bottle pressure | 25-45kg/cm2 | |
Higher -pressure gas consumption | 8000Ltr/min | |
Air pressure specification |
Work pressure | 5-6 kg/cm2 |
Temperature range | 10ºC | |
Consumption | 8000kcal/hr | |
Forzen water flow | 120L/min | |
Machine specification | Machine size | 5.5x1.8x1.9 |
Machine weight | 6.1tons |
Q1: which city are you in? how can I get to your factory? Are you a trading company or factory?
A1: We are in Zhangjiagang city, two hours driving from Shanghai. We are factory. Manufacturing mainly beverage filling and packagingmachines. We offer turnkey solutions with more than 10 years experience.
Q2: Why is your prices higher than others?
A2: We offer high-end machines in our business. Welcome to our factory to have a visit. And you will see the difference.
Q3: What is your delivery time?
A3: Normally 30-60 working days depends one machines, water machines are faster, carbonated drink machines are slower.
Q4: How to install my machines when it arrives? How much the cost?
A4: We will send our engineers to your factory to install the machines and train your staff how to operate the machines If needed. Or you can arrange engineers to study in our factory.
You are responsible for air tickets, accommodation and our engineer wage USD100/day/person.
Q5: How long time for installation?
A5: Subject to machines and the situation in your factory. If everything is ready, it will take about 10 days to 25 days.
Q6: How about the spare parts?
A6: We will send one year enough easy broken spare parts together with the machines for free, we suggest you buy more units to save international courier such as DHL, it is really costly.