Automatic 3 to 5 Gallon Alkaline Mineral Bottled Water Filling Machine Price

Zhangjiagang Proman Machine Co., Ltd.
  • Audited Supplier
  • 10 yrs

Contact Supplier

Product Highlights

  • High-Quality Materials: Constructed with high-quality stainless steel for corrosion resistance and easy cleaning.
  • Premium Electrical Components: Main electrical parts sourced from SIEMENS and OMRON for stable performance.
  • High Automation: Fully automatic operation with PLC and touch screen control for high efficiency.
  • Versatile Application: Designed for 3-5 gallon mineral water, pure water, and beverage packaging.
  • Compact Design: Linear structure with small footprint, integrating machine, electricity, and gas.
  • Customizable Options: Customizable material (Stainless Steel 304), function, and bottle type available.
  • Overseas Support: Engineers available to service machinery overseas for installation and training.
  • 1-Year Warranty: Comprehensive 1-year warranty coverage for peace of mind.

Product Images of Automatic 3 to 5 Gallon Alkaline Mineral Bottled Water Filling Machine Price

Automatic 3 to 5 Gallon Alkaline Mineral Bottled Water Filling Machine Price
Automatic 3 to 5 Gallon Alkaline Mineral Bottled Water Filling Machine Price pictures & photos
Automatic 3 to 5 Gallon Alkaline Mineral Bottled Water Filling Machine Price
Automatic 3 to 5 Gallon Alkaline Mineral Bottled Water Filling Machine Price pictures & photos
Automatic 3 to 5 Gallon Alkaline Mineral Bottled Water Filling Machine Price
Automatic 3 to 5 Gallon Alkaline Mineral Bottled Water Filling Machine Price pictures & photos
Automatic 3 to 5 Gallon Alkaline Mineral Bottled Water Filling Machine Price
Automatic 3 to 5 Gallon Alkaline Mineral Bottled Water Filling Machine Price pictures & photos
Automatic 3 to 5 Gallon Alkaline Mineral Bottled Water Filling Machine Price
Automatic 3 to 5 Gallon Alkaline Mineral Bottled Water Filling Machine Price pictures & photos
Automatic 3 to 5 Gallon Alkaline Mineral Bottled Water Filling Machine Price
Automatic 3 to 5 Gallon Alkaline Mineral Bottled Water Filling Machine Price pictures & photos
Automatic 3 to 5 Gallon Alkaline Mineral Bottled Water Filling Machine Price
  • Automatic 3 to 5 Gallon Alkaline Mineral Bottled Water Filling Machine Price
  • Automatic 3 to 5 Gallon Alkaline Mineral Bottled Water Filling Machine Price
    Automatic 3 to 5 Gallon Alkaline Mineral Bottled Water Filling Machine Price
  • Automatic 3 to 5 Gallon Alkaline Mineral Bottled Water Filling Machine Price
    Automatic 3 to 5 Gallon Alkaline Mineral Bottled Water Filling Machine Price
  • Automatic 3 to 5 Gallon Alkaline Mineral Bottled Water Filling Machine Price
    Automatic 3 to 5 Gallon Alkaline Mineral Bottled Water Filling Machine Price
  • Automatic 3 to 5 Gallon Alkaline Mineral Bottled Water Filling Machine Price
    Automatic 3 to 5 Gallon Alkaline Mineral Bottled Water Filling Machine Price
  • Automatic 3 to 5 Gallon Alkaline Mineral Bottled Water Filling Machine Price
    Automatic 3 to 5 Gallon Alkaline Mineral Bottled Water Filling Machine Price
  • Automatic 3 to 5 Gallon Alkaline Mineral Bottled Water Filling Machine Price
    Automatic 3 to 5 Gallon Alkaline Mineral Bottled Water Filling Machine Price

Find Similar Products

Product Description

Automatic 3 to 5 Gallon Alkaline Mineral Bottled Water Filling Machine Price
Product Description
The QGF series of bottled water filling line is designed for 3 gallon,5 gallon barrels of drinking water.

The model will be cleaned by filling and sealing.This is a good choice for the production of mineral water,prue water equipment.The machine adopts high quality stainless steel,corrosion resistance,easy to clean.

The main electrical components are SIEMENS,OMRON,and related parts.The machine has a good structure,small footprint,stable performance,high production efficiency,high degree of automation,is a collection of machine,electricity,gas in one of the new drinking water tank equipment.


Automatic 3 to 5 Gallon Alkaline Mineral Bottled Water Filling Machine Price
Automatic 3 to 5 Gallon Alkaline Mineral Bottled Water Filling Machine Price

 

Detailed Photos
Automatic 3 to 5 Gallon Alkaline Mineral Bottled Water Filling Machine Price
Automatic 3 to 5 Gallon Alkaline Mineral Bottled Water Filling Machine Price
Automatic 3 to 5 Gallon Alkaline Mineral Bottled Water Filling Machine Price
Automatic 3 to 5 Gallon Alkaline Mineral Bottled Water Filling Machine Price
Technical Parameter
Model QGF-100 QGF-200 QGF-300 QGF-450 QGF-600 QGF-900
Filling Head 1 2 3 4 4 6
Capacity 100 200 300 450 600 900
Installed Capacity(KW) 1.38 1.75 3.8 3.8 7.8 9.75
Weight(kg) 680 800 1500 2100 3000 3500
Volume 18.9L
Barrel Size φ270*490
Gas Pressure 0.4-0.6
Rate Voltage 380V/50HZ

 

Packaging & Shipping
Automatic 3 to 5 Gallon Alkaline Mineral Bottled Water Filling Machine Price

 

Company Profile
Automatic 3 to 5 Gallon Alkaline Mineral Bottled Water Filling Machine Price

Automatic 3 to 5 Gallon Alkaline Mineral Bottled Water Filling Machine Price

Certifications
Automatic 3 to 5 Gallon Alkaline Mineral Bottled Water Filling Machine Price

 

FAQ

Q1: which city are you in? how can I get to your factory? Are you a trading company or factory?
A1: We are in Zhangjiagang city, two hours driving from Shanghai. We are factory. Manufacturing mainly beverage filling and packagingmachines. We offer turnkey solutions with more than 10 years experience.

Q2: Why is your prices higher than others?
A2: We offer high-end machines in our business. Welcome to our factory to have a visit. And you will see the difference.

Q3: What is your delivery time?
A3: Normally 30-60 working days depends one machines, water machines are faster, carbonated drink machines are slower.

Q4: How to install my machines when it arrives? How much the cost?
A4: We will send our engineers to your factory to install the machines and train your staff how to operate the machines If needed. Or you can arrange engineers to study in our factory. 
You are responsible for air tickets, accommodation and our engineer wage USD100/day/person.

Q5: How long time for installation?
A5: Subject to machines and the situation in your factory. If everything is ready, it will take about 10 days to 25 days.

Q6: How about the spare parts?
A6: We will send one year enough easy broken spare parts together with the machines for free, we suggest you buy more units to save international courier such as DHL, it is really costly.

About the Supplier

This supplier has been audited by SGS. Verify the report on the official SGS website with ID "QIP-ASR244314". Items marked "verified" are certified.

Watch Video
Watch Video
Zhangjiagang Proman Machine Co., Ltd.
Zhangjiagang Proman Machine Co., Ltd.
Zhangjiagang Proman Machine Co., Ltd.
Zhangjiagang Proman Machine Co., Ltd.
Zhangjiagang Proman Machine Co., Ltd.
Zhangjiagang Proman Machine Co., Ltd.
Zhangjiagang Proman Machine Co., Ltd.
Zhangjiagang Proman Machine Co., Ltd.

About Our Factory & Business Background

Address
Yucai Industry Area, Sanxin Town Zhangjiagang City, Suzhou, Jiangsu, China
Terms of Payment
LC, T/T, Western Union, Small-amount payment
International Commercial Terms(Incoterms)
FOB, CFR, CIF, DAT, FAS, DDP, DAP, CIP, CPT, FCA, EXW, Others
Average Lead Time
Peak Season Lead Time: 1-3 months
Off Season Lead Time: one month
Nearest Port
shanghai

Our Production Capability & Technical Expertise

Main Products
China Water Filling Machine Supplier, Water Treatment System, Water Filling Machine Manufacturer From China, Juice/Carbonated Drink Filling Machine, 5L/5gallon 20liter Water Filling Machine, Bottle Blowing Machine, Injection Molding Machine, Oil Filling Machine, Water Bottling Machine Manufacturer, Water Filling Machine Factory

Our Industry Experience & Global Business Record

Export Year
2006-09-12
Main Markets
North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe

FAQ

Where is your factory located?
We are located in Zhangjiagang city, which is two hours driving from Shanghai. We are a manufacturing factory, not a trading company.
Why are your prices higher than others?
We offer high-end machines with superior quality and stability. We welcome you to visit our factory to see the difference in craftsmanship and components.
What is the delivery time?
Normally 30-60 working days depending on the machine type. Water filling machines are faster, while carbonated drink machines take longer.
How is installation handled and what is the cost?
We can send engineers to your factory for installation and training. You are responsible for air tickets, accommodation, and engineer wages at USD100/day/person. Alternatively, you can send engineers to our factory.
How long does installation take?
It depends on the machine and your factory's readiness. If everything is prepared, installation typically takes about 10 to 25 days.
Are spare parts provided?
Yes, we send one year's worth of easy-to-break spare parts for free with the machine. We suggest buying more units to save on international courier costs.

Send your message to this supplier

Contact Information
Recipient
Message

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

People who viewed this also viewed