Middle Speed Scale 12 Heads Pet Bottle Mineral Water Filling Bottling Plant 4000bph Fully Automatic

Product Details
Customization: Available
After-sales Service: Online and Offline Services
Warranty: 1 Year

360° Virtual Tour

Diamond Member Since 2017

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
to see all verified strength labels (14)
  • Middle Speed Scale 12 Heads Pet Bottle Mineral Water Filling Bottling Plant 4000bph Fully Automatic
  • Middle Speed Scale 12 Heads Pet Bottle Mineral Water Filling Bottling Plant 4000bph Fully Automatic
  • Middle Speed Scale 12 Heads Pet Bottle Mineral Water Filling Bottling Plant 4000bph Fully Automatic
  • Middle Speed Scale 12 Heads Pet Bottle Mineral Water Filling Bottling Plant 4000bph Fully Automatic
  • Middle Speed Scale 12 Heads Pet Bottle Mineral Water Filling Bottling Plant 4000bph Fully Automatic
  • Middle Speed Scale 12 Heads Pet Bottle Mineral Water Filling Bottling Plant 4000bph Fully Automatic
Find Similar Products
  • Overview
  • Product Description
  • Detailed Photos
  • Technical Parameter
  • Packaging & Shipping
  • Company Profile
  • Certifications
  • FAQ
Overview

Basic Info.

Model NO.
CGF12-12-6
Type
Piston Filling Machine
Automatic Grade
Fully Automatic
Material Type
Liquid
Filling Valve Head
Multi-Head
Feed Cylinder Structure
Multi-Room Feeding
Dosing Device
Capacity Cup
Filling Principle
Pressure
Packaging Container Lifting Structure
Chute Pneumatic Combination Lifting
Structure
Rotary
Packaging
Bottle
Packaging Material
Film
Product Name
Juice Water Filling Machine
Material
Stainless Steel 304
Processing Types
Pressure
Bottle Type
Pet Plastic/Glass Bottle
Usage
Beverage Production
Control
PLC+ Touch Screen
Certificate
CE, ISO, SGS
Capacity
1000-16000bph
Transport Package
Wooden Case
Specification
2450*1900*2300mm
Trademark
Proman
Origin
China
Production Capacity
200sets/Year Bottle

Product Description

Middle Speed Scale 12 Heads PET Bottle Mineral Water Filling Bottling Plant 4000BPH Fully Automatic
Product Description
3-in-1 filling machine, combined with rinsing, filling and capping. It is innovated and designed in the requirement of non-carbonated energy drinks, juice, tea, on the bases of introducing, digesting and absorbing advanced technology from Germany and Italy.
 
Middle Speed Scale 12 Heads Pet Bottle Mineral Water Filling Bottling Plant 4000bph Fully Automatic
Middle Speed Scale 12 Heads Pet Bottle Mineral Water Filling Bottling Plant 4000bph Fully Automatic
Detailed Photos
1. Rinser
- Spring cramps are used in the bottle washing process. The empty bottles can be turned over 180° Along the conveying rail. There are two times of internal and external washing, the efficiency of bottle washing is high.
- Rinsing machine adopts Sunswell original overturn and double-opened bottle clip. Bottle clip lock the bottleneck, the material of bottle clip is SUS304, which is hygienic and durable.
- Bottle clip equipped with efficient spray on nozzle. The extrusive droplet with 15° Angle ensures to wash all side of the bottle, and can save the water.
Middle Speed Scale 12 Heads Pet Bottle Mineral Water Filling Bottling Plant 4000bph Fully Automatic
2. Filler
- The design of filling structure is reasonable and hygiene dead angle, the run of equipment is stable, it can control the material from the bottleneck, the control accuracy is within ± 2mm.
- The filling valve material is SUS304
- The filling system has liquid level automatic control.
- Filling valve lift is controlled by the valve elevator, after filling valve contact the bottleneck, it start to fill.
- Bottle is conveying by the wheel in the filling part.
- The juice or other hot beverage can be backflow by return tank to control filling temperature.
Middle Speed Scale 12 Heads Pet Bottle Mineral Water Filling Bottling Plant 4000bph Fully Automatic
 
3. Capper
Screw capping machine is most precision part in the 3-1 machine, it has a big influence to the goods stability and defective rate. Our screw capping has following feature.
1) Sunswell import of advanced technology of screw capping, improve the stability and reliability of the screw capping machine. The magnetic torque is used for screw capping. The power of screw capping can be adjusted without steps. The power of the screw capping can also be fixed, and the caps will not be damaged, the capping is reliable.
2) In the screw capping part. It installed photoelectrical control, when it has no cap, or the cap is bad, the machine will stop automatically
Middle Speed Scale 12 Heads Pet Bottle Mineral Water Filling Bottling Plant 4000bph Fully Automatic
Technical Parameter
Model RCGF12-12-4 RCGF18-18-6 RCGF24-24-8 RCGF32-32-12
Capacity 3000 5000 8000 12000
Bottle Shape round and shape
PET Bottle(mm) (bottle diameter):φ50-φ110mm(height):160-320mm
Cap PE srew cap or cap
Filling Precision ≤±5%
Filling Pressure(Mpa) 0.15-0.35 0.15-0.35 0.15-0.35 0.15-0.35
Rinsing pressure(Mpa) 0.2-0.25 0.2-0.25 0.2-0.25 0.2-0.25
Total Power(KW) 3.6 4.4 5.2 6.2
Overall Size(mm) 2400*2000*2300 2800*2150*2300 3100*2450*2300 3800*2800*2500
Weight(kg) 3500 4500 6500 7500

 

Packaging & Shipping

Middle Speed Scale 12 Heads Pet Bottle Mineral Water Filling Bottling Plant 4000bph Fully Automatic

 

Company Profile

 

Middle Speed Scale 12 Heads Pet Bottle Mineral Water Filling Bottling Plant 4000bph Fully Automatic

Certifications

Middle Speed Scale 12 Heads Pet Bottle Mineral Water Filling Bottling Plant 4000bph Fully Automatic

 

FAQ

Q1: which city are you in? how can I get to your factory? Are you a trading company or factory?
A1: We are in Zhangjiagang city, two hours driving from Shanghai. We are factory. Manufacturing mainly beverage filling and packagingmachines. We offer turnkey solutions with more than 10 years experience.

Q2: Why is your prices higher than others?
A2: We offer high-end machines in our business. Welcome to our factory to have a visit. And you will see the difference.

Q3: What is your delivery time?
A3: Normally 30-60 working days depends one machines, water machines are faster, carbonated drink machines are slower.

Q4: How to install my machines when it arrives? How much the cost?
A4: We will send our engineers to your factory to install the machines and train your staff how to operate the machines If needed. Or you can arrange engineers to study in our factory.
You are responsible for air tickets, accommodation and our engineer wage USD100/day/person.

Q5: How long time for installation?
A5: Subject to machines and the situation in your factory. If everything is ready, it will take about 10 days to 25 days.

Q6: How about the spare parts?
A6: We will send one year enough easy broken spare parts together with the machines for free, we suggest you buy more units to save international courier such as DHL, it is really costly.

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier